PROJECTS / CASE STUDY
The Northern Canal
Cable Bridge landmark.
A cable-stayed crossing planned over an active commercial waterway, with structural and geotechnical considerations at the centre of delivery.
MAVERICK MERNOK / INFRASTRUCTURE & ENGINEERINGNORTHERN CANAL CABLE BRIDGE
$310Mportfolio metric in project brief
2024–2026project timeline target
24sensors in reference design
PROJECT PROFILE
Project at a glance
01
Client: Ministry of Highways & Transport
02
Type: Cable-stayed bridge
03
Location: Northern National Corridor
04
Scope: Multi-lane river crossing
THE CHALLENGE
A complex crossing and demanding conditions
The reference brief describes a multi-lane, pre-stressed cable-stayed crossing over a commercial waterway. Wind exposure and variable ground conditions require careful structural and geotechnical planning.
THE APPROACH
Coordinated engineering and monitoring
The proposed approach combines deep-pile anchoring, low-carbon concrete options and embedded load monitoring to support structural review through delivery.
NEXT STEPS
Have a complex crossing to deliver?
Talk with our team.
Explore how coordinated bridge engineering can support your project.