The Northern Canal
Cable Bridge landmark.

A cable-stayed crossing planned over an active commercial waterway, with structural and geotechnical considerations at the centre of delivery.

MAVERICK MERNOK / INFRASTRUCTURE & ENGINEERINGNORTHERN CANAL CABLE BRIDGE
$310Mportfolio metric in project brief
2024–2026project timeline target
24sensors in reference design
PROJECT PROFILE

Project at a glance

01

Client: Ministry of Highways & Transport

02

Type: Cable-stayed bridge

03

Location: Northern National Corridor

04

Scope: Multi-lane river crossing

THE CHALLENGE

A complex crossing and demanding conditions

The reference brief describes a multi-lane, pre-stressed cable-stayed crossing over a commercial waterway. Wind exposure and variable ground conditions require careful structural and geotechnical planning.

THE APPROACH

Coordinated engineering and monitoring

The proposed approach combines deep-pile anchoring, low-carbon concrete options and embedded load monitoring to support structural review through delivery.